Skip to content
Blog· UK defence policy

Defence Industrial Strategy 2025: 76 measures, two dates

FORCE reads the UK Defence Industrial Strategy 2025 for a defence prime: 76 policy measures in its Accountability Table, two of which carry a date.

Thomas Hepp

· 9 min read

The Defence Industrial Strategy was presented to Parliament as CP 1388 on 8 September 2025 and debated in the Commons the same day. A year on it is still the text a UK supplier is measured against, and at 112 pages it is long enough for the difference between a commitment and an ambition to disappear.

FORCE read the published text against the Accountability Table at the back of it, the list the Ministry of Defence uses to say who owns what. Every figure below is a count of that document, and every count names the passage it came from.

What does the Defence Industrial Strategy commit to for suppliers?

The Defence Industrial Strategy commits to 76 policy measures, set out in the Accountability Table under six chapter headings, one for each of the six priority outcomes listed in the Ministerial Foreword. Every measure sits under a named senior responsible officer. Two measures name a date. One names a sum of money, and that money is not the Ministry of Defence's.

Chapter of the Accountability Table Policy measures Measures naming a date
Defence is an Engine for Growth 12 one
Backing UK Based Businesses 13 one
"The UK at the leading edge of defence innovation" 15 none
A Resilient UK Industrial Base 16 none
Fixing defence procurement 11 none
Forging New Partnerships 9 none

The two dated measures are a Defence Finance and Investment Strategy, to be developed "by early 2026", and a UK offsets regime to be "launched in the first half of 2026", subject to a public consultation. The single sum is an additional £4 billion of British Business Bank Industrial Strategy Growth Capital, which the table describes as supporting the government's Industrial Strategy sectors rather than defence alone. The other 73 measures name neither a date nor a figure.

How the strategy assigns responsibility for delivery

The Accountability Table names the National Armaments Director 28 times, more than any other post. The Permanent Secretary appears 13 times, the Chief of Defence Nuclear twice, and four owners sit outside the Ministry of Defence altogether: the National Wealth Fund, the British Business Bank, UK Export Finance and the Department for Business and Trade. The table introduces itself in two sentences:

The below sets out Senior Official leadership for implementation of policies set out in this strategy. It is reflective of the current status of the Defence Reform programme which is ongoing.

Across the whole document the National Armaments Director is named 46 times, and the strategy attaches an invest budget of £11 billion per year to the group the post leads. A supplier reading the strategy for who to approach gets a consistent answer. A supplier reading it for when gets one in 38.

Which years does the strategy's own plan name?

The strategy's plan through to 2035 places nineteen milestones in four calendar years and leaves seven of the eleven years from 2025 to 2035 empty.

Year in the plan Milestones Examples the plan names
2025 nine National Armaments Director appointed; UK Defence Innovation launched; Defence Investment Plan published
2026 seven UK offsets regime launched, subject to full consultation; Defence Finance and Investment Strategy launched
2027 none —
2028 one MOD spending with SMEs increased by £2.5 billion
2029 to 2034 none —
2035 two deliver the next UK defence unicorn; realise international ambitions

Nine of the nineteen milestones fall in 2025, the year of publication, and seven more in 2026. The 2035 column, which carries the horizon the strategy is written towards, holds two entries and no figure.

What the strategy dates in defence procurement

Four commitments in the procurement chapter name a day as well as a month, which makes them more specific than anything in the Accountability Table. By 1 December 2025 the National Armaments Director was to establish a coordinating authority for market engagement inside the NAD Group. By 31 March 2026 the Director General Commercial and Industry was to mandate a central digital platform on which suppliers register once and bid many times. By 1 April 2026 every major procurement was to carry an assessment of exportability, with major procurement defined in the document as a Category A programme at a threshold of £400m. By the same date the National Armaments Director was to require a spiral-by-default approach in all acquisitions.

The segmented approach to procurement attaches three timescale targets to three kinds of buy: under two years to first contract for major modular platforms, under 12 months for pace-setting spiral and modular upgrades, and three-month cycles for rapid commercial exploitation. Alongside them the strategy commits to reforming the Acquisition Pipeline so that industry receives a five-year forecast of planned procurements, with the ambition to review and extend it.

Which commitments carry money, and whose money is it?

Money in the Defence Industrial Strategy attaches to some commitments and not to others, and the two figures in the Ministerial Foreword appear nowhere else in the document.

Commitment Figure the strategy names Where the figure sits
Munitions supply chains £6 billion this Parliament, including £1.5 billion for an always-on pipeline executive summary and the resilience chapter
Sovereign warhead programme £15 billion this Parliament executive summary and the nuclear chapter
UK Defence Innovation ringfenced annual budget of at least £400m executive summary and the innovation chapter
Novel technologies at least 10% of the equipment procurement budget from 2026 executive summary and the innovation chapter
Uncrewed and autonomous systems £4 billion over this Parliament innovation chapter
Spending with SMEs an increase of £2.5 billion by May 2028 four places, including the 2028 column of the plan
Defence skills £182 million Ministerial Foreword only
Defence Growth Deals £250 million Ministerial Foreword only
British Business Bank growth capital an additional £4 billion Accountability Table; Industrial Strategy sectors, not defence alone

The chapter that sets out the Defence Growth Deals names five first-wave locations — Plymouth, South Yorkshire, Northern Ireland, Scotland and Wales — and no figure at all. The £250 million and the £182 million are each named once, in the foreword, and neither is repeated in the chapter that implements it or in the Accountability Table.

Where the strategy names a capability without naming its enabler

The Defence Industrial Strategy lists its capability sub-sectors in one place and its supply chain inputs in another, and never states which input belongs to which sub-sector. The Executive Summary names the national security industrial priorities, then five supply chain priorities, then twelve frontier industries. The Strategic Framework repeats all three lists with one difference: construction joins the supply chain priorities, making six. Eight of the named terms appear exactly twice in 112 pages, once in each list, and nowhere else.

Named in both lists and nowhere else Which list
ground combat systems national security priority
cryptography national security priority
directed energy weapons frontier industry
"next generation land and maritime capabilities" frontier industry
drones and autonomous systems frontier industry
engineering biology frontier industry
energetic material supply chain priority
rare-earth elements supply chain priority

Combat air is named 21 times across the document and semiconductors 18, with the semiconductor entry carrying a case study and a named factory in County Durham. Energetic material is named twice, and the strategy assigns the whole supply chain list to a Defence Supply Chain Capability Programme that is itself named four times. FORCE separates capabilities from the enablers they depend on because a capability named without its enabler is a demand signal a supplier cannot cost.

What the strategy defers to the Defence Investment Plan

The Defence Investment Plan is named ten times in the Defence Industrial Strategy, and the strategy hands it the work of saying what will actually be bought. The Strategic Framework states that "the forthcoming Defence Investment Plan will outline our investment priorities, taking into account our priority national security sub-sectors and the associated UK industrial capability", and the procurement chapter names Autumn 2025 as the date for delivering it. The Defence Investment Plan is also given the job of setting priorities within the 10% ring fence for novel technologies.

So the document that names the sub-sectors is not the document that funds them. A supplier who wants a line item rather than a category is directed, ten times, to a second publication. That is a finding about how the two documents divide the work, not a defect in either.

What this analysis cannot establish

FORCE cannot establish from the Defence Industrial Strategy alone whether any of its 76 measures will be honoured. A measure with a date is a dated intention, and the September 2025 text reports on nothing that happened after it.

Four further limits are worth stating plainly. Whether the two dated Accountability Table measures were met is outside this document and needs the later record. Whether a sub-sector named twice is unfunded cannot be read from the count — a term may carry a programme this strategy does not describe. Whether the Accountability Table is complete is answered by the table itself, which calls its own contents reflective of a reform programme that is ongoing. And what any supplier's position ought to be is not a question FORCE answers: the analysis gives no recommendations for action, and evaluation and the decision stay with the client.

How FORCE reads a document like this

FORCE turns a released document set into a capability map of six combat functions, with every entry traceable to the source passage it came from, and returns it within five working days. The doctrine register behind that work holds 6,128 documents from 33 countries published between 1997 and 2026, of which 321 are curated records and 13 sit in the sustainment and industry group.

Three of those thirteen bear directly on this strategy: RUSI's A Defence Industrial Strategy for the UK from 2022, the German Nationale Sicherheits- und Verteidigungsindustriestrategie of 2020, and Bruegel's 2024 brief on a European defence industrial strategy. Read against them, the 2025 UK text is legible as what it is — a strategy that names its owners with precision, its dates sparingly, and its capability sub-sectors without the inputs they run on. FORCE sets out how that work runs for suppliers on the industry and suppliers page.

Sources

  1. Defence Industrial Strategy 2025: Making Defence an Engine for Growth — UK Ministry of Defence, 2025-09-08
  2. Defence Industrial Strategy 2025, full text (CP 1388) — UK Ministry of Defence, 2025-09-08
  3. Defence Industrial Strategy: Commons debate — Hansard, House of Commons, 2025-09-08
  4. A Defence Industrial Strategy for the UK — RUSI
  5. Nationale Sicherheits- und Verteidigungsindustriestrategie — Bundesministerium der Verteidigung
  6. A European Defence Industrial Strategy in a Hostile World — Bruegel
Defence Industrial StrategyUK MODProcurement

Thomas Hepp

Co-founder and CTO, OriginStamp AG, Kreuzlingen

Co-founder and CTO of OriginStamp AG, and co-author of the peer-reviewed paper its timestamping service rests on. The research behind it, at the University of Konstanz on trusted timestamping and the provenance of digital records, is cited over 400 times. FORCE applies that discipline to a defence document set: posts here count what a document states, name the passage each figure came from, and stop where the document does.

Newsletter

Each new analysis by email.

A post goes out when it is published: the document it reads, the audience it was read for, and what the capability map showed. Nothing else is sent, and the list can be left with one click.

One step

Send us the question, not the documents.

Describe the decision that has to be taken and roughly what you could release.

Request an assessment